Illinois Coal Combustion Residuals (CCR) Rule Compliance Data and Information
This website is intended to satisfy the requirement under the CCR Rule (section 257.107) to maintain a publicly accessible internet site (CCR website) containing the information specified in that section. The required information will be posted when it is available.
On December 11, 2020, Dynegy Midwest Generation, LLC transferred the Havana Site to Finch Development, LLC, a subsidiary of Commercial Liability Partners, LLC.
- 2022
- 2021
- 2020
- 2019
- 2018
- 2017
- 2016
- 2015
2015 Havana East Ash Pond CPT report (pdf)
2016 10 Havana East Ash Pond FOS Cert Report (pdf)
2016 10 Havana East Ash Pond Full Cert Report (pdf)
2016 10 Havana East Ash Pond Geotechnical report (pdf)
2016 10 Havana East Ash Pond Hazard Assessment Report (pdf)
2016 10 Havana East Ash Pond IDF Cert Report (pdf)
2016 10 Havana East Ash Pond Initial Hazard Assessment (pdf)
2016 10 Havana East Ash Pond Liner Cert Report (pdf)
2016 10 Havana East Ash Pond Post-Closure Plan (pdf)
2016 10 Havana East Ash Pond SS Cert Report (pdf)
2016 10 Havana Power Station History of Construction (pdf)
2016 Havana - Dynegy Geotechnical Data Report (pdf)
2017-Havana-Surface Impoundment EAP-Revision (pdf)
2017 10 17 Havana East Ash Pond (Cells 1, 2, 3, and 4)_Well Construction Records (pdf)
2017 10 17 Havana East Ash Pond Sampling and Analysis Plan (pdf)
2017 10 17 Havana Hydrogeologic Monitoring Plan-z (pdf)
2017 10 17 Havana Hydrogeologic Monitoring Plan (pdf)
2017 10 17 Monitoring System Cert letter Dynegy Havana EAP (pdf)
2017 10 17 Statistical Analysis Plan_Dynegy Midwest Generation, LLC (pdf)
2017 10 17 Statistical Plan Certification Havana East Ash Pond (Cells 1, 2, 3, and 4) (pdf)
2018 Havana CCR East Ash Pond Annual GW Monitoring & CA Report (pdf)
2019 Havana CCR East Ash Pond Annual GW Monitoring & CA Report (pdf)
2019 Havana East Ash Pond SSLs (pdf)
2020 Figure 1 Havana Eash Ash Pond Monitoring Well Location Map (pdf)
2020 Havana CCR East Ash Pond Annual GW Monitoring & CA Report_Draft (pdf)
2020 Havana East Ash Pond SSLs (pdf)
2020 Havana Groundwater Tables-Rhenz-PC (pdf)
2021 Havana EAP Rev2_102021 (pdf)
2021 Havana Form CCR 1 base complete (pdf)
2020 Havana Annual Surface Inspection Certification Report-East Ash Pond Cells 1,2,3,4 (pdf)
2020 Havana Annual Groundwater Monitoring and Corrective Acton Report (pdf)
2020 Havana Annual CCR Fugitive Dust Control Report-East Ash Pond Cells 1, 2, 3, 4 (pdf)
Illinois 12-Month Coal Combustion Byproducts Report-Havana Power Station (pdf)
2018 Havana East Ash Pond Assessment Monitoring Notification (pdf)
2018-Havana-Annual Fugitive Dust Control Report-East Ash Pond Cells 1, 2, 3, 4 (pdf)
2018-Havana-Location Restriction Demonstration-East Ash Pond Cells 1, 2, 3, 4 (pdf)
2017 10 17 Havana CCR East Ash Pond (Cells 1, 2, 3, and 4) Statistical Plan Certification (pdf)
2017 10 17 Havana CCR East Ash Pond Monitoring System Certification Letter (pdf)
2017 Havana CCR Annual Fugitive Dust Control Report (pdf)
2017 Havana CCR East Ash Pond Annual Groundwater Monitoring and Corrective Action Report (pdf)
Havana CCR Notice of Availability (pdf)
East Ash Pond Structural Stability Assessment (pdf)
East Ash Pond Safety Factor Assessment (pdf)
East Ash Pond Post-Closure Plan (pdf)</a
East Ash Pond Liner Evaluation (pdf)
East Ash Pond Inflow Design and Flood Control System Plan (pdf)
East Ash Pond Hazard Potential Assessment (pdf)
East Ash Pond Closure Plan (pdf)
2016 Havana CCR Fugitive Dust Control Annual Report (pdf)
2016 Havana CCR Annual Dam Inspection Report East Ash Pond (pdf)